GSLV-F17 / EOS-05
ISRO · GSLV

At a glance
- Status
- launched
- Provider
- ISRO
- Vehicle
- GSLV
- Window
- 3 September 2026 · 21:25 UTC
- From
- Second Launch Pad, Satish Dhawan Space Centre, Sriharikota, India
- Destination
- Sub-geosynchronous transfer orbit, nominally 170 km by 28,934 km at 19.28 degrees on ISRO's mission brochure
- Last verified
- 27 September 2026
Outcome
LAUNCHED · verified against the sources below on 27 September 2026.
The payload
EOS-05, which ISRO describes as India's first imaging satellite to work from geosynchronous orbit, about 2,367 kg at launch. GSLV-F17 was the 19th flight of the Geosynchronous Satellite Launch Vehicle, flying a 4 m composite ogive fairing, and ISRO's mission page records that it placed EOS-05 into the intended orbit. ISRO's launch page gives Friday 4 September 2026 at 02:55 IST, which is 21:25 UTC on 3 September, and Jonathan McDowell's catalogue records liftoff at the same minute.
Status history
- 27 Sep 2026Added as launched, three weeks after the flight, which earlier passes of this board missed. ISRO's mission page states that GSLV-F17 accomplished its mission and placed EOS-05 into a sub-geosynchronous transfer orbit; its launch page gives 02:55 IST on 4 September, which is 21:25 UTC on 3 September, and Jonathan McDowell's catalogue records the same liftoff time.
Related
Sources
- isro.gov.in · https://www.isro.gov.in/Mission_GSLVF17.html
- isro.gov.in · https://www.isro.gov.in/GSLV_F17_EOS_05_Mission_Launch_Streaming.html
- isro.gov.in · https://www.isro.gov.in/media_isro/image/index/GSLVF17_EOS05/GSLV_F17_EOS_05_Mission_Brochure_31082026_Revized.pdf
- planet4589.org · https://planet4589.org/space/gcat/tsv/launch/launch.tsv